Pick Parts Picking Scenario – Using RF
For automobile assembly operations, one production order is released and 3 transfer orders are generated per shop during WM
Staging(one TO per shop)
Currently 2-Step confirmation (Pick ; Transfer confirmation) settings is enabled for TO confirmation
During picking, operator physically pick one item(approximately 300 line items in one transfer order) confirm line item in RF screen by scanning source bin
Current system behavior :
- System allows to perform 2nd step confirmation for the first step confirmed items even if TO is partially confirmed i.e. 100 out of 300 items are first step confirmed; remaining 200 line items are not 1st step confirmed
- System doesn’t allow the operator to perform 1st step confirmation of remaining 200 line items. This is due to some of the line items in TO are 2nd step confirmed (Work around : Cancel the TO and create new TO and perform 1st Step confirmation using LT12, so purpose of picking using RF PDA is not possible)
- Also noticed, system generates Goods Issue (Material document) only when the last item of TO is 2nd Step confirmed. So all the line items appear in COGI till last line item is 2nd step confirmed.
Expected Bahaviour :
- System should allow to perform 1st step confirmation of open/remaining TO items (even if some of line items in TO are 2nd step confirmed). Is there any settings to be done?
- If the above is achievable, system should generate Goods Issue(Material document) for the 2nd step confirmed items partially and those line items must disappear from COGI
It would be great, if you could provide inputs on the expected beviour config.settings in SAP WM. Please let me know in case you need more inputs