yes, i checked in that material document but to be honest i am not sure on this movement.
what i understood is the stock was transferred to the another plant with 641 E then in that plant they have done 101 E (GR STO for salesOrSt) , and then 261 E (GI order fm. sls.ord.)
I see the same sales order is there in this plant with a PO item and Order reservation. not sure on this stock and requirement transfer.
thanks,
Ravindra