Hello,
Please refer this link,
Define separate subcontractor as a storage location. you will have to select movement type 311 E for transport posting.
While posting good issue for PO, transfer the BOM material from the S/C storage location for movement type 543 you can perform.
Best Regards,
R.Brahmankar