Hello PI Gurus,
I have a requirement to merge 5 files into one file in PO 7.5. Recently, we have upgraded from PI 7.1 to PO 7.5 and I have to set up the Environment for BPM on single stack from scratch.
It would be helpful if anyone can suggest me the pre-requisites and steps required for creating BPM in PO.
Regards,
Shankul Saxena