Hi All
Is it possible at all to transfer costs between two secondary cost elements of type 43?
I know this is a peculiar requirement but still I need to know if it is possible at all ?
Regards
Arijit
Hi All
Is it possible at all to transfer costs between two secondary cost elements of type 43?
I know this is a peculiar requirement but still I need to know if it is possible at all ?
Regards
Arijit