Re: MM subcontracting process with freight in the outbound delivery

$
0
0

Hi,

 

I have done the scenario with the users and they have determined that with can not use freight conditions in PO, because legally we must have a GR before doing MIRO, and as a said before the freight usually must be paid before that we have done the GR. So ¿what option do I have to get all the cost in material 2 and being able to paid freight cost with the freight service accepted even when I have not done GR?

 

Thanks

 

Jorge G